Description:
As a summer tourist destination, the Schroon Lake wastewater system often sees widely varying flows during the year. A system upgrade saw the demolition and replacement of existing structures and the construction of expanded facilities: aeration basins, clarifiers, a new process building and complete sludge removal system.
Products Used:
The PENETRON System was chosen as the concrete waterproofing material for this project.
© 2018 Penetron Hellas A.B.E.E. - Πολιτική Απορρήτου/GDPR / Όροι Χρήσης - Χάρτης Ιστότοπου