Clavalitè River Hydroelectric Plant

Fenis (Aosta), Italy

Description:
The largest private hydroelectric plant in Europe, the Clavalitè River plant draws water from the dam (with a 20,000m3 water capacity and a height of 525m) through three turbines to generate a total of 21,000 kilowatts/hour. 

Products Used:
The entire concrete structure was successfully treated with PENETRON ADMIX. The compressive strength of the Penetron Admix treated concrete on this project was measured at Rck = 45MPa (after 60 days of curing in water) over the control sample with Rck = 35Mpa.

Πρόσθετες Πληροφορίες

Περισσότερα σε αυτή την κατηγορία: « City Park Ice-Skating Rink Cleveland Zoo / African Elephant Crossing »

Αναζήτηση Προϊόντος

Κατηγορίες Προϊόντων