Description:
This new wastewater treatment plant in Lima meets stringent regulations for the re-use of effluent to irrigate 1,000 acres of farmland each day, meeting a critical need. The project included installation of more than 267 kilometers of lead lines, mains, distribution, overflow, collectors, secondary drinking water and wastewater pipelines, and 7,800 drinking water and sewerage connections to households; the construction and fitting out of fourteen reservoirs, five tanks, three entry chambers and 244 chambers; the drainage pumping station and control and automation system.
Products Used:
The PENETRON System was used to waterproof and protect the concrete of three water tanks in the Manchay plant against corrosion and chemical attack.