Tuesday, 23 December 2014 20:50

Zhongguancun West Zone

Beijing, China

Description:
Initially treated with a membrane solution, areas of this huge basement structure began leaking at the seams; the PENETRON-treated areas remained dry. The developer switched the whole project to PENETRON. Several other projects by this same developer are now specified with the PENETRON waterproofing system.

Products Used:
The PENENTRON System was applied after the developers viewed multiple projects treated with the PENENTRON System in Beijing, and were amply convinced of its effectiveness.

Tuesday, 23 December 2014 20:48

Waterloo House

Hamilton, Bermuda

Description:
A centerpiece of the revitalized waterfront in Hamilton, Bermuda, the elegant new Waterloo House offers almost 90,000 square feet of office space and luxury penthouse apartments.  The five-story building also has underground parking and eight new boat slips in the harbor directly in front of the building. 

Products Used:
PENETRON ADMIX was used to treat about 3,000 cubic yards of concrete, mainly for the building foundation and basement structures.  It enabled the structure to resist seawater ingress under the higher levels of water pressure found belowground.

Tuesday, 23 December 2014 20:42

Vantage Norwest

Bella Vista, Australia

Description:
A 5-storey commercial building with many innovative design features, Vantage is located on a landmark Norwest location (close to Sydney) and boasts mountain views with 12,278m2 of office space, 3 levels of parking for 569 cars and a 5-star NABERS energy rating that includes an articulated facade with floor to ceiling double glazed performance glass for energy efficiency.

Products Used:
PENETRON ADMIX was used on over 3,000m3 of concrete; 600m2 of PENETRON PLUS and 100m2 of PENEBAR SW were used for the retention tank, stairs, planter boxes, ground slab, balconies / sunshades, roof slab, roof shaft and slab, tunnel room and the generator roof.

Tuesday, 23 December 2014 20:35

Tropicana City Mall

Petaling Jaya, Malaysia

Description:
The Tropicana City Mall has 4 retail levels, a 12-story office tower and 3 basement levels, with a gross floor area of about 715,000 square feet (65,032 m2). The exposed partially cast basement stood abandoned for ten years and needed special treatment as heavy leakage was evident.

Products Used:
PENECRETE MORTAR, PENETRON and PENEPLUG pressure grouting were all successfully used to restore and waterproof the basement structure.

Tuesday, 23 December 2014 20:31

The Smith

New York, NY, USA

Description:
Located in Brooklyn, NY, “The Smith” is a 13-story, mixed use building with 62,000 square feet of residential space (55 units with high ceilings and oversized windows with views of New York City), 60,000 square feet of hotel, retail, office, and community space on the lower four floors and a 34,000 square foot underground parking garage.

Products Used:
Now an attractive building with a brick exterior fascia, the entire perimeter cavity space is protected on the interior with PENETRON, creating a full perimeter, protective envelope for the entire building.

Tuesday, 23 December 2014 20:20

The Boulevard

Cape Town, South Africa

Description:
Already a recognizable landmark at the gateway to Cape Town and with 36,000m2 of high-quality office space, The Boulevard incorporates seven individual units all constructed on a podium with three basements to provide one of the highest parking ratios in Cape Town (with 4 bays/100m2 ). The facility also includes restaurants and coffee shops.

Products Used:
About 8,100m3 of concrete on the “The Boulevard” site are protected against water ingress by PENETRON ADMIX.

Tuesday, 23 December 2014 20:11

Suria Jelutong

Shah Alam, Selangor, Malaysia

Description:

Located in Shah Alam, the state capital of Selangor, Suria Jelutong is a mixed development project located in the upcoming commercial center of Bukit Jelutong – an attractive address in popular Shah Alam, adjacent to the Bukit Cahaya Forest Reserve.

Products Used:
To protect the entire foundation against water penetration and concrete deterioration, 6,500m3 of concrete were treated with PENETRON ADMIX; all construction joints were sealed with PENEBAR SW-55 waterstops.

Tuesday, 23 December 2014 20:10

Supertech E Square

Noida, India

Description:

The design of this commercial center features an open atrium and passages for the smooth flow of shoppers and attractive business areas for retailers.  The building is located between the Noida Express Highway and the Jaypee Greens park area, and surrounded by two hotels and various residential buildings.   The waterproofing needs of the project encompassed three levels and the basement.

Products Used:
PENETRON ADMIX was used to cover a 7,750m2 area, including the basement and three above-ground levels.

Tuesday, 23 December 2014 20:09

Sunway Nexis

Kota Dmansara, Petailing Jaya, Malaysia

Description:
Sunway Nexis is a mixed development with commercial and residential areas: a 3-storey retail building (Nexis Shoppe), a 13-storey commercial tower (Nexis Biz Suite) and a 20-storey small home/office building (Nexis Flexi Suite). All buildings feature a 2-level basement parking garage. The development also offers health and fitness facilities, lush landscaping and green “backdrops” visible from most of the units.

Products Used:
A certified green product, PENETRON ADMIX was used to protect 4,800m3 of basement concrete and a total of 1,100 meters of PENEBAR SW-55 were installed to seal construction joints.

Tuesday, 23 December 2014 19:48

Samsung Insurance Building

Yangpyeong Dong, South Korea

Description:
Samsung Insurance, the leading insurance company in Korea, built a branch office building in Seoul adjacent to the river. This location, with high hydrostatic water pressure, posed challenges to a waterproofing protection system. The originally specified waterproofing system – a permeable cementitious coating – failed to protect the site from water ingress; numerous leaks appeared in the building walls and basement.

Products Used:
The PENETRON crack repair system was applied to repair the cracks and joints. PENEPLUG was applied to immediately stop the active leaks, and PENETRON and PENECRETE MORTAR were applied to the walls. Finally, the top surface was finished with a coat of PENETRON for complete protection from high hydrostatic water pressure for the retaining walls and basement.

Page 1 of 3